Dinu and his family, including his mother (far left) and sister Rajni (in the front with the bowl of rice)Saturday, November 27, 2010
11/27: An opportunity to help
Dinu and his family, including his mother (far left) and sister Rajni (in the front with the bowl of rice)Wednesday, November 24, 2010
Thanksgiving


Saturday, August 28, 2010
8/28: Seattle Thank You
I don't know how or if I will continue this blog. I imagine there will be some things to say about the transition from "travel mode" to "back at home mode." Really, though, what I have been feeling this morning is appreciative. I had never done a blog before and I learned to love doing it. Every once in a while I would meet a person and say, "Nice to meet you," and the person would reply, "Nice to be met," or someone I know, after saying, "Nice to see you," would reply, "Nice to be seen." And that is how I feel. I have been trying to understand my attraction to writing the blog and to being read. My intention was to be as open as possible, and it was nice having a venue to do that, for I know that I shared parts of myself that I do not normally do. It was nice to be read, and nice to be seen. I know that communication is a "two-way street," and I have no control over how I have been seen (which is actually a pretty true life lesson), but I am so appreciative of all of you out there who have read my blog, and have, to some degree, "seen me." To make this long story short - Thank You from all of my heart.
Tuesday, August 24, 2010
8/22-8/25: Littleton Colorado, Back in the USA
Family dinner: Amy and Russ with their children Ricki and Rory, my parents Adele and Phil, my cousin Dana and her daughter Alexis, and me.
Mount Rainier, [14,411 feet high (4392 meters), located about 50 miles (80 kilometers) Southeast of Seattle] from the airplane on the flight to SeattleIt is both very strange and very normal being back in Seattle in my home. The first thing I noticed was how many things we have (quite a shock from living for the past year with just what I could carry in my back pack). I actually had to lay down for a while and let it sink in. I think it will be the impetus to "clean house" and get rid of stuff. (Though it was sort of fun opening up a drawer and putting on a different of pair socks, a different t-shirt and different underwear, but I am still stuck wearing the same pair of pants, for I lost too much weight to wear any of the pants in my closet.) Driving from place to place came back without thinking, but I couldn't remember where our living room clock was, or how to turn on my mobile phone.
Monday, August 23, 2010
8/23: Quotes and Reflection on the Sacred
"If the universe is an unfolding bud, then I am a part of its creative surge, along with the flowing of water and the growing of pines. I can find a kind of camaraderie in this universe, once I recover from the astonishment of it." (p. 147)
"Even if we don't believe in God, we walk out the door on a sacred morning and lift our eyes to the sacred rain and are called to remember our sacred obligations of care and celebration." (p. 151)
The part I love is the last line - "our sacred obligations of care and celebration." At every moment it is our responsibility to look and to see, to feel and to know that this "every-day reality" is a mystery and a miracle to behold. The most mundane of all actions - a single breath - is a miracle of creation, a miracle of life. Oh, to pay such attention, to be so aware and appreciative, to live and walk through our lives and our days in such a state!
Friday, August 20, 2010
8/19-8/22: Bristol, England
I met Ginetta twice in India - first in Pushkar, Rajasthan in November, and then again three months later in Southern India in Hampi, Karnataka. So I thought it would be a good way to end my trip - visiting an old friend. And it was.
Vegetable market and street scene in Clifton, the "up-scale" area of Bristol
Bristol Cathedral - originally known as the Abbey of Saint Augustine, was founded in 1140CE, and constructed over a period of 700 years.
Also Bristol Cathedral
St Mary Redcliffe Church - construction started in the 12th century CE and completed in the 15th century, has a height of 292 feet (about 90 meters) - the third tallest English church. Queen Elizabeth described it as "the fairest, goodliest, and most famous parish church in England."
Due to damage during WWII, much of the original stain glass has been replaced.
Royal York Crescent - "the longest crescent in Europe, or maybe in the world," say Ginetta. "Or maybe not."
Walking the streets of Bristol, an old private school in the background
The "world famous" (according to the Bristol tourist guide)Clifton Suspension Bridge, crossing the Avon Gorge, designed by the Victorian engineer Isambard Brunel, built in 1864.
View of the River Avon and the Avon Gorge from the Clifton Suspension Bridge
Sailing in the harbor area on a Saturday
Scenic Bristol's rivers and canals
Many people live on these house boats, and can explore much of the area through the rivers and canals
Peter, Ginetta's cat - my second "cat friend" on this trip. Peter would sleep with me on Ginetta's couch
Quote from Wild Comfort, p. 68: ""'Those who dwell . . . among the beauties and mysteries of the earth are never alone . . .' (Rachel Carson) . . . There are no edges in this world. The water, the snow, the bear, the memory of the blackbird, the urgent growth of the lily are all one beautiful, mysterious thing, and we are part of that one thing. How, then, can we ever be alone."
The end: It was really fun hanging out with Ginetta for three days, meeting her friends (all of them artists of some sort - painters, musicians, song writers), and going for walks through the beautiful city of Bristol. On my last evening of this year sabbatical, I went with Ginetta to a dinner party at Angie's house. Angie asked me what was my favorite place that I visited, and I couldn't come up with one. Thinking back, I realize now that more important than the places I went were the people I met. Their open hearts touched my heart, becoming part of who I am. I am thankful for the time I have had this year, to connect - heart to heart - to so many good people.
8/22 - A very long day: It started at 2:30AM, catching a bus from Bristol to Heathrow airport. My flight from London to Denver (to visit my parents) went through Madrid and then Chicago. The first leg out of Heathrow Airport was delayed, creating quite a rush in Madrid to catch my international flight to the States. I ran through the airport to my gate, arriving during "last call." Then the flight to Chicago was also late in departing, so that I was met as I exited the plane and given an "express connection" pass, rushing me through customs and security at Chicago's O'Hare airport so I could be at the gate on time for my flight to Denver. Then there was a bus from Denver's airport to Cold Springs, where my sister Amy picked me up. All in all, it took exctly 24 hours, door-to-door.
And here I am, back in America. To tell the truth, it still feels just like traveling - new place, new people, new culture.
Quote from Wild Comfort, p. 69-70: ""I am sure of this much, that Earth lights these small signal fires - not for us, but among us - and we can find them if we look. If we are not afraid, if we can keep our balance, if we let our anxious selves dissolve into the beauties and mysteries of the night, we will find a way to peace and assurance. Signal fires burn all over the land."
Last foreign personal reflection: As I feel my sense of reality dissolve around me, have faith that there are "signal fires" all around me and within me. Nothing dies, just dissolves and reforms into something else. My responsibility is to take each step into the fog consciously, with as much self awareness as I am, with my senses and my heart wide open to appreciate the beauties and mysteries all around me, within me.
8/20: Natan and Ultimate Frisbee
Monday, August 16, 2010
8/11 through 8/19: Paris
"Failing to notice a gift dishonors it, and deflects the love of the giver. That's what's wrong with living a careless life, storing up sorrow, waking up regretful, walking unaware. But to turn the gift in your hands, to say, this is wonderful and beautiful, this is a great gift - this honors the gift and the giver. Maybe this is what Hank has been trying to make me understand. Notice the gift. Be astonished at it. Be glad for it, care about it. Keep it in mind. This is the greatest gift a person can give in return.
"This is your work," my friend told me, "which is work of substance and prayer and wild attentiveness, which is the real deal, which is why we are here." (p. 19)
For me, the concept of "living a careless life" hit home. "Carelessness" is being sucked into the future and into the past. So how to remain conscious of the ever-flowing present, the "now" which continues to stretch from moment to moment, which is, of course, the only thing that "now" does, if you let it.
For Sheri's 50th birthday, she offered to spend it with my family in Paris, so I met her in Paris. Being abroad for the past year, this was the first time I met my new niece, Poppy.
Quote from Wild Comfort, p. 64: "Prayer is when the night falls over thought." (by the French philosopher Alain)







